Services / Land Aggregation

Land Aggregation

Contiguous, title-clean, registered land — assembled parcel by parcel.

The Problem

Projects don’t fail on the last parcel. They fail on the parcel nobody checked properly.

A 300 MW solar project needs roughly 1,200 to 1,500 acres. In Karnataka that is almost never one seller. It is 80 to 200 khatedars across four or five villages, with fragmented holdings, undivided family shares, minors’ interests, tenancy exposure, grant and inam restrictions, and RTC entries that do not match who is actually farming the land.

Most developers discover this in the wrong order. Parcels are tied up on the strength of a broker’s assurance, advances are paid, and the title problem surfaces during lender due diligence — eight weeks before financial close, when the cost of a gap in the chain is the entire drawdown schedule.

The second failure is geometric. Parcels get bought where they are available, not where the array needs them, and the project ends up with a polygon it cannot build on efficiently or evacuate from economically.

Failure modes we are hired to prevent

  • A 30-year title flow with an unresolved partition or an unrecorded mutation
  • Hold-out parcels sitting inside the array boundary, discovered after 80% acquisition
  • Land tied up at a price set before anyone benchmarked guidance value
  • Land-use conversion started after registration instead of before
  • A land file that a lender’s counsel cannot audit

Our Response

How we run it

We assemble contiguous, encumbrance-free, connectivity-viable land and hand it over in a condition that survives lender diligence. Title is verified before money moves, not after.

Every parcel enters a register at first contact and stays in it through registration, khata and mutation — so at any point in the mandate you can see exactly which survey numbers are clean, which are consented, which are executed and which are at risk.

Process

Stage by stage

#StageWhat happens
01Site screening & terrain assessmentPolygon shortlisting against resource, slope, evacuation distance, forest and wildlife buffers, water bodies, habitations and existing infrastructure.
02Survey number mappingVillage cadastral overlay; Bhoomi RTC pull for every survey number in the polygon; tippan/Mojini sketch reconciled to ground.
03Title due diligence30-year title chain, encumbrance certificate, mutation register chain, partition status, minors’ interest, PTCL / inam / grant restrictions, tenancy exposure. Conducted with empanelled counsel.
04Owner engagement & rate discoveryVillage-level engagement, guidance value versus prevailing market benchmarking, consent mapping, early identification of hold-out risk inside the array boundary.
05Agreement executionRegistered Agreement to Sale or lease deed, power of attorney where appropriate, advance schedule tied to documentary milestones.
06Statutory pathwayConversion via the Deputy Commissioner, or the automatic conversion route available to renewable energy projects under the 2025 Land Revenue Rules — sequenced before registration, not after.
07Compensatory afforestation landWhere the project diverts forest land, the developer must provide an equal extent of non-forest land for compensatory afforestation, handed to the Forest Department free of encumbrances and notified as protected forest before final forest approval. We identify suitable blocks — ten hectares or more, ideally twenty-five or more to avoid the small-block surcharge — verify title, aggregate them and complete transfer and mutation to the Forest Department, on the same register as the project land.
08Registration & mutationSub-registrar execution, khata transfer, mutation into the SPV’s name, updated RTC reflecting the project entity.
09HandoverConsolidated land dossier issued to developer and lender in audit format.

Deliverables

What you hold at the end

Spatial SHP / KML / PDF

  • Village-wise project polygon with survey-number-level GIS layer
  • Array-boundary overlay showing acquired, consented, in-progress and at-risk parcels

Register & diligence XLSX / PDF

  • Parcel register — survey number, extent, khatedar, RTC status, encumbrance, consent, execution status
  • 30-year title opinion pack per parcel
  • Risk log for restricted, disputed and hold-out parcels

Executed documents PDF, lender format

  • Registered Agreements to Sale / lease deeds
  • Conversion order from the Deputy Commissioner, or deemed-conversion acknowledgement
  • Registered sale deeds, khata certificates and mutated RTCs in the SPV’s name
  • Compensatory afforestation land schedule, title pack and transfer to the Forest Department, where forest land is diverted
  • Land Due Diligence Handover File

Send us your polygon or your capacity target.

We’ll return a land feasibility read — village coverage, likely title complexity, indicative rate band and aggregation risk — within 10 working days.